Herefordshire, in numbers

Projects

Herefordshire, County of council area. Every figure carries its own date.

The local plans, investments and decisions worth following.

5 selected records checked against official sources. A plan is not a completed project; each record shows the stage its source establishes.

Hereford railway station

Hereford Transport Hub

A new interchange and public space beside the railway station aim to make changing between buses, trains, walking and cycling easier.

Construction continuing · evidence dated 2026-07-13

Responsible body: Herefordshire Council

What the source says: The July update confirms construction moving into the surrounding public areas and retains a later-2026 completion target. It does not report opening.

Next thing to establish: What is the approved cost, including ongoing maintenance?

Progress, funding and source
Cost
Not established by the evidence checked.
Funding
Not established by the evidence checked.
Area covered
Unmapped: a verified current ward boundary or council ward statement is still needed.

No verified ward footprint is assigned.

Major Herefordshire projects continue to make progress →

Source checked 2026-10-17. A plan or announcement is not proof of completion.

Questions for the next progress report

  • Which funding is committed, and what remains conditional?
  • Which neighbourhoods are covered by an official project plan, and which benefits still need testing?
  • What is the next published milestone, and what evidence will show residents benefit?
How to track delivery →

Shire Hall and Hereford Museum and Art Gallery

Shire Hall and Hereford Museum renewal

The council is revising plans for these historic buildings after surveys and rising costs made the original schemes unaffordable.

Revised designs and pre-construction work · evidence dated 2026-08-04

Responsible body: Herefordshire Council

What the source says: The council reports design, surveys and procurement work while revised schemes go through funding and governance processes. The Stronger Hereford Board had not yet formed a view on the revised proposals.

Next thing to establish: What is the approved cost, including ongoing maintenance?

Progress, funding and source
Cost
Not established by the evidence checked.
Funding
Not established by the evidence checked.
Area covered
Unmapped: a verified current ward boundary or council ward statement is still needed.

No verified ward footprint is assigned.

Update on Shirehall and Hereford Museum and Art Gallery projects →

Source checked 2026-10-17. A plan or announcement is not proof of completion.

Questions for the next progress report

  • Which funding is committed, and what remains conditional?
  • Which neighbourhoods are covered by an official project plan, and which benefits still need testing?
  • What is the next published milestone, and what evidence will show residents benefit?

Reset Shire Hall and museum plans to a deliverable scope →

Keep structural findings visible in heritage budgets →

Connect local skills to local opportunities →

Target support where disadvantages overlap →

How to track delivery →

Merton Meadow, Hereford

Merton Meadow flood alleviation and wetlands

Flood works use connected ponds and wetlands to prepare the area for possible future homes and public space.

Construction of flood-alleviation works started · evidence dated 2026-02-11

Responsible body: Herefordshire Council and Speller Metcalfe

What the source says: The council reports a £2 million government-funded flood scheme under construction. It describes drainage capacity for up to 400 homes, subject to separate planning and development decisions. Drainage capacity is not permission, funding or completion of those homes.

Next thing to establish: Which neighbourhoods are covered by an official project plan, and which benefits still need testing?

Progress, funding and source
Cost
£2 million flood-alleviation scheme, as reported in February 2026; this is not the cost of the proposed housing.
Funding
Central government funding for the flood-alleviation scheme.
Area covered
No verified current ward footprint is assigned. The named location or council-wide remit does not establish benefits in every ward.

No verified ward footprint is assigned.

Merton Meadow flood alleviation and wetlands →

Source checked 2026-10-17. A plan or announcement is not proof of completion.

Questions for the next progress report

  • What is the next published milestone, and what evidence will show residents benefit?

Verify flood and drainage works before counting future homes →

Build on Hereford’s water-management work →

Make room for homes people can afford →

Target support where disadvantages overlap →

How to track delivery →

Leominster

Leominster streets and heritage

Wider pavements, renewed road surfaces and restored shopfronts addressed reported problems with access and drainage. Later economic effects have not been established.

Streets substantially renewed; finishing work remained in December 2024 · evidence dated 2024-12-23

Responsible body: Herefordshire Council

What the source says: Wider pavements, renewed road surfaces and restored shopfronts addressed reported problems with access and drainage. Later economic effects have not been established.

Next thing to establish: What is the approved cost, including ongoing maintenance?

Progress, funding and source
Cost
Not established by the evidence checked.
Funding
Not established by the evidence checked.
Area covered
Named project location only. No official impact boundary has been matched to current wards; proximity does not establish a ward-wide benefit.

No verified ward footprint is assigned.

Restoring Leominster’s heart and heritage →

Source checked 2026-10-17. A plan or announcement is not proof of completion.

Questions for the next progress report

  • Which funding is committed, and what remains conditional?
  • Which neighbourhoods are covered by an official project plan, and which benefits still need testing?
  • What is the next published milestone, and what evidence will show residents benefit?

Keep Leominster’s renewed streets accessible →

How to track delivery →

Model Farm, Hildersley, near Ross-on-Wye

Ross-on-Wye Enterprise Park infrastructure

Access from the A40, roads, utilities and drainage are being built before businesses can develop plots. Jobs depend on later occupiers.

Infrastructure work underway; spring 2027 completion forecast · source does not state a status date

Responsible body: Herefordshire Council

What the source says: Access from the A40, roads, utilities and drainage are being built before businesses can develop plots. Jobs depend on later occupiers.

Next thing to establish: What dated decision or progress report confirms the current stage?

Progress, funding and source
Cost
Not established by the evidence checked.
Funding
Not established by the evidence checked.
Area covered
Named project location only. No official impact boundary has been matched to current wards; proximity does not establish a ward-wide benefit.

No verified ward footprint is assigned.

Ross-on-Wye Enterprise Park resident updates →

Source checked 2026-10-17. A plan or announcement is not proof of completion.

Questions for the next progress report

  • What is the approved cost, including ongoing maintenance?
  • Which funding is committed, and what remains conditional?
  • Which neighbourhoods are covered by an official project plan, and which benefits still need testing?
  • What is the next published milestone, and what evidence will show residents benefit?

Turn prepared land into working premises at Ross →

Connect local skills to local opportunities →

How to track delivery →